        Hengshui Xin Feng Gabion Mesh Co., Ltd. is a gabion mesh, gabion, heavy hexagonal wire mesh, galvanized wire gabion, Renault pad, and other professional manufacturer of the product, the factory has first passed the ISO9001 quality management system certification, and to participate inthe Three Gorges, the South, such as large-scale the Dipo protection and water conservancy projects, we welcome Advisory Specifications, Price, to visit the plant to discuss.
NEWS
Location: Home > news
Gabion construction technical requirements
Author:admin    Time:2012-10-23

More the Duo Gebin network knowledge can continue to focus on my  above comes from Gabion.   

The Gabion Mesh Factory prompts you need to pay attention to some of the technical requirements, depending on the individuals and units,  Gabion construction. For everyone to do slightly divided, and I hope for your help. Quick look at the following.  

The general provisions of the personal details of the construction

Respond to the contract or design documents to conduct an in-depth study, before the start of .1 construction units. And shall prepare the construction organization design.

Reasonable arrangements for the construction plans. .2 Actual situation should be based on hydrological and meteorological data and site.

Should do the preparatory work, .3 pre-construction. "Stone flat" Temporary works and make preparations.

2.2 Construction Quality

Inspection of the data, information and construction drawings geometry. 2.2.1 The construction unit is necessary according to the design documents.

And timely provide the required measurement data. 2.2.2 The construction unit shall designate a person responsible for the measurement work.

2.2.3 Construction DD the accuracy indicators should meet the following requirements:

1 plane position allowable error of ± 30mm ~ ± 40mm

2 elevation allows the the error ± 30mm3 slope flatness relative height difference between the allowable range of ± 30mm

Required strict maintenance 2.2.4 Construction of borrowed or set of construction control flags, elevation points. And periodic testing correction.

2.3 of machinery, equipment and materials to prepare

2.3.1 construction machinery, construction tools, equipment and materials, models, specifications, technical performance should be based on the progress of the construction and strength make reasonable arrangements to deploy.

And advance the quality of raw materials and semi-finished products inspection. 2.3.2 approach based on the progress of the construction should organize information in a timely manner.

Before use. 2.3.3 approach of raw materials and semi-finished products must have passed the test.

The attention of the business units, the general provisions

Deal with contract or design documents to conduct an in-depth study. Before the start of the construction unit. And shall prepare the construction organization design.

Reasonable arrangements for the construction plans. 2. Should be based on the actual situation of the hydrological and meteorological data and site.

Should do the preparatory work, 3. Before the start. "Stone flat" Temporary works and make preparations.

Second, the quality of construction

Inspection of the data, information and construction drawings geometry. Construction unit must be based on the design documents.

And timely provide the required measurement data. The construction unit shall designate a person responsible for the measurement work.

3 Construction DD precision indicators should meet the following requirements:

3.1 flat position allowable error of ± 30mm ~ ± 40mm

3.2 elevation allowable error of ± 30mm

3.3 Slope unevenness relative height difference allowable range ± 30mm

Necessary to strictly maintenance, construction 3.4 borrow or construction set control flags, elevation points. And periodic testing correction.

Machinery, equipment and materials to prepare

Construction machinery, construction tools, equipment and materials, models, specifications, technical performance should be based on the progress of the construction and strength make reasonable arrangements to deploy.

And advance the quality of raw materials and semi-finished products inspection. According to the progress of the construction should be promptly organize data approach.

Before use. 3. Entering the necessary raw materials and semi-finished products after passing inspection.